English Institute of Sport, Technogym

Helm-X supplied and installed this 3 storey structure inside the EIS Sheffield. Challenging design incorporating this structure inside the already present indoor sports arena. Helm-X designed and managed the foundation piling, steel fabrication and erection, concrete metal decking, glazing to building frontage, 1 internal staircase, and 1 external fire escape. Interior fit out completed by Central Leisure.

January 9, 2019 11:23 am