Covid Canopy
Helm-X supplied and installed this canopy at a high school in Birmingham, to provide a large sheltered outdoor space so the school could re-open safely during the pandemic. This canopy is designed to fit in the exisitng playground measuring 15mx16m, with an opal polycarbonate multiwall roof. Installed in 1 week, rapid turnaround in time for school re-opening in September 2020.
September 22, 2020 10:52 am